Allied-telesis x900 Series Switch and SwitchBlade x908 Bedienungsanleitung Seite 6

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 55
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 5
Installation and Safety Guide
5
The following items are shipped with each switch. Contact your authorised
distributor or reseller if any are damaged or missing.
All models ship with:
one cable for connecting the switch to a terminal or PC
two rack-mount brackets
depending on the switch, an appropriate number of M4 screws for
rack-mount brackets
this Installation and Safety Guide
one warranty card
All models except the SwitchBlade x908 also ship with:
AC power cord(s) (AC models only)
one power cord retaining kit (AC models only)
1 retaining clip
2 retaining plates
•2 screws
depending on the switch, four or five rubber feet with screws for mounting
the switch on a level surface
Some products also ship with a Documentation and Tools CD-ROM containing
documentation and utilities. For more information, see “Obtaining
Documentation and Resources” on page 30.
Seitenansicht 5
1 2 3 4 5 6 7 8 9 10 11 ... 54 55

Kommentare zu diesen Handbüchern

Keine Kommentare