Allied-telesis x510 Series Bedienungsanleitung Seite 108

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 122
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 107
Chapter 8: Cabling the Networking Ports
108
Installing SFP
and SFP+
Modules
To install SFP and SFP+ transceivers in slots 27 and 28 of the 28-port
switches and slots 51 and 52 of the 52-port switches, perform the following
procedure:
1. Remove the dust plug from a transceiver slot on the switch.
Figure 56 shows the dust plug being removed from port 25 on the AT-
x510-28GTX Switch.
Figure 56. Removing the Dust Plug from an SFP+ Slot
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. If you are installing the transceiver in a top slot, position the
transceiver with the Allied Telesis label facing up. If you are installing
the transceiver in a bottom slot, position the transceiver with the label
facing down.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 57 on page 109.
Seitenansicht 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 121 122

Kommentare zu diesen Handbüchern

Keine Kommentare