
3. The Load GUI Resource File Update Profile dialog box will be displayed.
4. Specify the filename of the profile to be loaded.
5. Finally, click on the button. AlliedView-UM will load the specified
GUI Resource File Update Operation profile.
NOTE:
The GUI Resource File Update operation profile contains the Selected Devices list. While loading, AlliedView-UM checks
each item in this list against the currently loaded devices in the Device Families Pane. Only entries that have a matching
device in the Device Families Pane will be loaded and added to the Selected Devices list in the GUI Resource File Update
Operation pane.
A summary window will be displayed indicating which entries were successfully added.
D. Starting the GUI Resource File Update Operation
The GUI Resource File Update Operation can only be started when the parameters have
been properly set.
1. Click on the
button.
AlliedView™-UM 2.0 USER’S GUIDE Page 91 of 128
Kommentare zu diesen Handbüchern