Allied-telesis ALLIEDVIEW-UM 1.6 Bedienungsanleitung Seite 58

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 129
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 57
Allied Telesis AlliedView-UM 1.6
User's Guide
PN 613-000381 Rev B
Page 58 of 129
8.4 STARTING
THE INTERIM/MAINTENANCE RELEASE UPGRADE OPERATION
The Interim/Maintenance Release Upgrade Operation can only be started when the parameters have
been properly set.
1. Click on the button.
2. A progress window will be displayed, indicating the overall status of the operation. When the
Interim/Maintenance Release Upgrade operation ends, the Operation Logs pane will be updated to
contain detailed information about the operation for each device.
3. Clicking the
or the button will abort the Interim/Maintenance Release Upgrade
operation. Depending on the time this button is clicked, the operation may or may not complete for
devices that are in progress. Devices that were not able to complete the operation will have a status
of “Aborted”.
Seitenansicht 57
1 2 ... 53 54 55 56 57 58 59 60 61 62 63 ... 128 129

Kommentare zu diesen Handbüchern

Keine Kommentare