Allied Telesis AT-S82 Installationsanleitung Seite 32

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 52
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 31
Chapter 2: Installation
32
Unpacking the Switch
To unpack the switch, perform the following procedure:
1. Remove all components from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Ensure that the following hardware components are included in the
package:
Two rack-mount brackets
Eight rack-mount bracket screws (black)
Four wall-mounting screws (stainless steel)
Four plastic anchors (for wall-mounting)
Four rubber feet (for desktop use)
One power cord
Documentation CD
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
Seitenansicht 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 51 52

Kommentare zu diesen Handbüchern

Keine Kommentare